PRODUCTION TIME & AVAILABILITY
Machine Downtime
Machine downtime is time when equipment is not running within a defined operating or measurement context. It can arise from failures, setups, planned activities or other stops, which should be classified consistently.
MACHINE DOWNTIME IN PRACTICE
- Define the clockState scheduled and planned production time.
- Capture the stopRecord start, finish and reason.
- Review the impactAssess output, recovery and prevention.
Use the agreed units, actual records and approved procedures for your operation.
A WORKED EXAMPLE
A stop needs a time base and a reason.
During 480 minutes of defined planned production time, a machine stops for 30 minutes. Under this simplified availability calculation, run time is 450 minutes and availability is 450 ÷ 480 = 93.75%. This is not the full OEE calculation.
WHAT THIS MEANS FOR YOUR QUOTE
Agree the requirement before comparing quotes
Use the actual shipment, stock and service requirements. Record the billing unit, included work and responsibility for exceptions.
A LITTLE MORE CONTEXT
Questions about Machine Downtime
Is availability alone full OEE?
No.
Can time-base changes affect the percentage?
Yes.
Should stop reasons be verified?
Yes. Record and review the supporting evidence.
Source & example notes
Vorne OEE: production-time and stop-time definitions.
Sources provide background on the linked topic. Product documentation describes a particular implementation; confirm the rules, contract and procedures that apply to your operation.
Quantities, costs and scenarios are illustrative, not operating targets, approved handling instructions or guarantees. Source guidance reviewed 23 October 2026.